ISSUANCE OF BUILDING PERMIT
ABOUT THE SERVICE:
Building Permits or Construction Permits are secured to the construction, alteration, repair, conversion, demolition, or addition of any building or structure or any portion thereof, within the territorial jurisdiction of the City of Tayabas
OFFICE DIVISION:
Office of the Building Official
TYPE OF TRANSACTION:
G2B - Government to Business, G2C - Government to Customer, G2G - Government to Government
Classification:
Simple
WHO MAY AVAIL:
Any person, firm or corporation, including any agency or instrumentality of the government, who wants to construct, alter, repair, convert, move, demolish, add any building or structure or any portion thereof within the territorial jurisdiction of Tayabas City shall apply for a corresponding construction permit. (Section 301, Paragraph 1 of the NBCP).
CHECKLIST OF REQUIREMENTS:
|
CHECKLIST OF REQUIREMENTS |
WHERE TO SECURE |
|
RESIDENTIAL BUILDING (NEW CONSTRUCTION) |
|
|
Applicant |
|
City Assessor’s Office |
|
City Treasurer’s Office |
|
Barangay |
|
Assessor’s Office |
|
Planning Office |
|
DOLE (online) |
|
DPWH QUEZON First (Lucban) |
|
Provincial Engineering Office (Lucena) |
|
Applicant |
|
Applicant |
|
Applicant |
|
Applicant |
|
Applicant |
|
Applicant |
|
For Commercial Building (New Construction) |
|
|
Applicant |
|
City Assessor’s Offic |
|
City Treasurer’s Office |
|
Applicant |
|
Assessor’s Office |
|
Planning Office |
|
DOLE (online) |
|
DPWH QUEZON First (Lucban) |
|
Provincial Engineering Office (Lucena) |
|
Applicant |
|
Applicant |
|
Applicant |
|
National Agency |
|
Applicant |
|
Applicant |
|
Applicant |
CLIENT STEPS:
| CLIENT STEPS | DEPARTMENT ACTIONS | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
| 1. Preparation & Submission of Documents | ||||
|
1.1.1 Visit the office (Window 1) for the hardcopy of forms and 1.1.2 Download forms & checklist https://bit. ly/3UiOCRd |
1.1 Receives the same documents. | None | 3 minutes | Allison R. Cuevas Engineering Aide Building Official |
| 1.2 Prepare the necessary documents, sort and arrange according to the checklist and place into three (3) labeled separate envelope for OBO, BFP and ZONING |
||||
| 1.3 Submission of documents, plans and forms | 1.3.1 Checking the completeness of documents. 1.3.1.1 If complete, ask the client to acknowledge the checklist by affixing signature and filling out the contact information, encode, assign & write transaction number and followup date then give the transaction stub. 1.3.1.2 If incomplete, put remarks on the checklist of the deficiencies and return the documents, plans, and forms to client. |
None | 20 minutes (in total) | Allison R. Cuevas Engineering Aide Building Official |
| Internal Process 1.3.2 Forwarding Documents 1.3.2.1 to Zoning 1.3.2.2 to BFP 1.3.2.3 to Evaluation Area |
None | 5 minutes | Allison R. Cuevas Engineering Aide Building Official |
|
| Internal Process 1.3.3 Site verification | None | 30 minutes | Zaldy R. Cademia Engineer II Building Official Engr. John Anthony E. Sioco Engr. Vincent P. Celemin Engr. Joe Bryan E. Jader Engineer I Building Official |
|
| Internal Process 1.3.4 Evaluation of Plans, Permit Forms, & Technical Support Document 1.3.4.1 Line & Grade 1.3.4.2 Architectural/ BP 344 1.3.4.3 Electrical 1.3.4.4 Civil/ Structural 1.3.4.5 Mechanical 1.3.4.6 Electronics |
None | a.simple-3 working days b.complex-7 working days c.highly technical-20 working days |
Ar. Mark Anthony M. Barquilla Architect III Building Official Ar. Elizabeth D. Enriquez Building Official Engr. Gilbert T. Oabel Engineer IV Building Official Engr. Desiree C. Unlayao Engineer I Building Official Engr. John Anthony E. Sioco Engineer I Building Official Engr. Maidee Ann R. Salvan Engineer I Building Official |
|
| External Process 1.3.5 Pre-Inspection/ Evaluation of Plans, Permit, Forms & Technical Support Documents 1.3.5.1 Locational Clearance 1.3.5.2 Fire Safety Inspection Certificate |
None | 3 days (simultaneous processing) | Zoning BFP |
|
| Internal Process 1.3.6.1 If complied, the application will be assessed 1.3.6.2 If the application is not compliant, all documents will be forwarded to front/admin staff 1.3.7 Notify client of application status |
None | 1 hour 5 minutes (varies from project to project) 5 minutes (varies from project to project) |
Engr. Francis S. Pacaigue CGADH-1/OIC Building Official Allison R. Cuevas Engineering Aide Building Official Allison R. Cuevas Engineering Aide Building Official |
|
| External Process 1.3.8.1 If complied, the application will be assessed 1.3.8.2 If the application is not compliant, all documents will be forwarded to OBO front/admin staff 1.3.9 Notify client of application status |
None | *Included in the 3 days processing ** included in the 3 days processing 5 minutes (varies from project to project) |
Zoning/ BFP Zoning/ BFP Allison R. Cuevas Engineering Aide Building Official |
|
| 1.4 Pull out documents and sign the Transmittal sheet acknowledging receipt (Refer with your design professionals for your necessary corrections as indicated on the copy of Transmittal given.) |
1.4 Assist client in documents/permit forms/ plans pulled-out for compliance |
None | 10 minutes (varies from project to project) | Allison R. Cuevas Engineering Aide Building Official |
| 1.5 Submit the corrected documents | 1.5.1 Check if corrections have been done. 1.5.1.1 Forward to the concerned evaluator for endorsement of compliance. 1.5.1.2 Forward to Zoning/BFP External Process 1.5.2 Re-evaluation of the corrected plans Internal Process 1.5.3 re-evaluation of the corrected documents/ permits/ plans 1.5.3.1 Line & Grade 1.5.3.2 Architectural/ BP 344 1.5.3.3 Electrical 1.5.3.4 Civil/ Structural 1.5.3.5 Mechanical 1.5.3.6 Electronics 1.5.4 If the deficiencies are compliant application is forwarded to assessment 1.5.5 Notification for the claiming of Order of payment |
None | 10 minutes (varies from project to project) 5 minutes(varies from project to project) 5 minutes (varies from project to project) 5 minutes(varies from project to project) 1 hour (varies from project to project) 1 hour (varies from project to project) 1 hour (varies from project to project) 1 hour (varies from project to project) 1 hour (varies from project to project) 1 hour (varies from project to project) 5 minutes (varies from project to project) 2 minutes |
Allison R. Cuevas Engineering Aide Building Official Allison R. Cuevas Engineering Aide Building Official Allison R. Cuevas Engineering Aide Building Official Zoning/ BFP Ar. Mark Anthony M. Barquilla Architect III Building Official Ar. Elizabeth D. Enriquez Architect III Building Official Engr. Gilbert T. Oabel Engineer IV Building Official Engr. Desiree C. Unlayao Engineer I Building Official Engr. John Anthony E. Sioco Engineer I Building Official Engr. Maidee Ann R. Salvan Engineer I Building Official Allison R. Cuevas Engineering Aide Building Official Allison R. Cuevas Engineering Aide Building Official |
| 2. Payment | ||||
| 2.1 Pay the Cashier | 2.1.1 Issue Official Receipt | Refer to the schedule fees (National Building Code of the Philippines PD 1096 and its RIRR, Revenue Code, Philippine Fire Code) |
5 minutes ** included in the 3 days |
Treasurer’s Office BFP |
| Internal Process 2.1.2 Printing of Locational Clearance 2.1.3 Printing of Fire Safety Evaluation Clearance Forms |
None | * included in the 3 days processing ** included in the 3 days processing |
Zoning BFP |
|
| 2.2 Present OR and Clearances | 2.2 Accept OR and Record/ Encode | None | 5 minutes | Allison R. Cuevas Engineering Aide Building Official |
| Internal Process 2.3.1 Print Certificate of Building 2.3.2 Stamped assigned number on Permit 2.3.3 Signing as approval of Certificate & Permit Forms and plans |
None | 5 minutes 5 minutes 10 minutes |
Allison R. Cuevas Engineering Aide Building Official Allison R. Cuevas Engineering Aide Building Official Engr. Francis S. Pacaigue CGADH-1/OIC Building Official |
|
| 3. Releasing of Approved Construction Permit | ||||
| 3.1 Claiming of Approved Certificate of Building Permit & Plans and other owner’s copy of other documents 3.2 Sign Transmittal & Logbook & Liability Form as acknowledgement of receipt of documents |
3.1 Releasing of documents 3.2 Provide logbook, Transmittal Sheet, & Liability Form |
None | 10 minutes in total | Allison R. Cuevas Engineering Aide Building Official Allison R. Cuevas Engineering Aide Building Official |
| TOTAL | Refer to the schedule fees (National Building Code of the Philippines PD 1096 and its RIRR, Revenue Code, Philippine Fire Code) |
For Simple1 Transactions: 3 DAYS 2 HOURS 30 MINUTES For Complex2 Transactions: 7 DAYS 2 HOURS 30 MINUTES For Highly Technical Transactions: 20 DAYS 2 HOURS 30 MINUTES |
||
| END OF TRANSACTION |