CITIZEN’S CHARTER

ISSUANCE OF DEVELOPMENT/MEMORIAL PERMIT

ABOUT THE SERVICE:

A Development Permit shall be secured prior to the development of any area or portion of land prior to subdivision thereof within the territorial jurisdiction of the City of Tayabas.


OFFICE DIVISION:

Office of the Building Official

TYPE OF TRANSACTION:

G2C - Government to Customer, G2B - Government to Business, G2G - Government to Government

Classification:

Highly Technical

WHO MAY AVAIL:

Any person, firm or corporation, including any agency or instrumentality of the government who wants to subdivide a portion/area of land within the jurisdiction of the City of Tayabas


CHECKLIST OF REQUIREMENTS:

CHECKLIST OF REQUIREMENTS WHERE TO SECURE
FOR TYPICAL SUBDIVISION  
  • Topographic Map (4 originally signed and sealed by Geodetic Engineer)
Applicant
  • Site Development Plan (4 originally signed and sealed by Civil Engr/ Architect
Applicant
  • Road (geometric structural) Design (4 copies originally signed and sealed by Civil Engr
Applicant
  • Storm Drainage and Sewer System (4 copies originally signed and sealed by Sanitary Engineer)
Applicant
  • Water System Layout and Details (4 copies originally signed and sealed by Sanitary Engr)
Applicant
  • Site Grading Plan (4 copies originally signed by Civil Engr)
Applicant
  • Master Site Development Plan (4 copies signed and sealed by Civil Engr/ Architect, if any)Technical Documents (Bill of Materials/ Cost Estimates, Technical Specification (4 originally copies signed by Civil Engineer)
Applicant
  • Technical Documents (Bill of Materials/ Cost Estimates, Technical Specification (4 originally copies signed by Civil Engineer)
Applicant
  • MERALCO Certification (Feasible for power connection) (1 Original & 1 photocopy)
Applicant
  • PRIME WATER/ QMWD Certification (Feasible for water connection) (1 original & 1 photocopy)
Applicant
  • Overhead Tank Plan (4 copies originally signed and sealed Civil Engr) with NWRB Clearance (1 original & 1 photocopy), in the absence of PRIME WATER/ QMWD
Applicant
  • Engineering Geological and Geohazard Assessment Report prepared by qualified geologist or engineer as required under Administrative Order No. 2000-28 signed by the DENR Secretary Antonio H. Cerilles (1 original & 1 Photocopy)
Applicant
  • Environmental Compliance Certificate (1 Original & 1 photocopy)
Applicant
  • Lot title (2 certified true copy) 
Applicant
  • Proof of Right to the Lot (2 certified true copy), if applicable
Applicant
  • Tax Declaration & Tax Receipt (2 photocopies each)
Applicant
  • Barangay Clearance (1 original & 1 photocopy)
Applicant
  • PALC (Preliminary Approval & Locational Clearance) (1 original & 1 photocopy)
Applicant
  • PT/PRC of Professionals with 3 specimen signatures (1 original copy for each professional)
Applicant
  • Secretary’s Certificate/ SPA/Authorization, if applicable
Applicant
  • Valid IDs of Applicant/Representatives
Applicant

: Development Permit - qualified for multi-stage processing

CLIENT STEPS:

 CLIENT STEPS DEPARTMENT ACTIONS FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE
1 Preparation & Submission of Documents        

1.1.1 Visit the office (Window) for the hard copy of forms and checklist

 


1.1.2 Download forms & checklist
https://bit.ly/49y05lr

1.1 Give set of documents for construction permit application & assist client None 

5 minutes

 

 


Realtime

Allison R. Cuevas
Engineering Aide

Building Official

1.2 Prepare the necessary documents, sort and arrange according to checklist and secured each set with a staple or binder clip        
1.3 Submission documents

1.3.1 Checking the completeness of documents.


1.3.1.1 If complete, ask the client to acknowledge the checklist by affixing
signature and filling out the contact information, encode, assign & write transaction number and follow-up date then give the transaction stub

 


1.3.1.2 If incomplete, put remarks on the checklist of the deficiencies and return the documents, plans and forms to the client.

None

 

 

 

 

 

 

 

 

 

 

 

None

 

 

 

 

 

 

None

 

 

20 minutes

 

 

 

 

 

 

 

 

5 minutes

 

 

 

 

 

5 minutes

Allison R. Cuevas
Engineering Aide

Building Official 

 

 

 

 

 

Allison R. Cuevas
Engineering Aide

Building Official

 

 

 

Allison R. Cuevas
Engineering Aide

Building Official

 

Internal Process


1.3.2 Forward documents to Inspection Area

None 5 minutes Allison R. Cuevas
Engineering Aide

Building Official
  Internal Process
1.3.3. Site Verification
None 1 day

Engr. Zaldy R. Cademia
Engineer II

Building Official

Ar. Elizabeth D. Enriquez
Architect III
Building Official

Ar. Mark Anthony M. Barquilla
Architect II
Building Official

Engr. Gilbert T. Oabel
Engineer IV
Building Official

Engr. Ara Tabitha A. Quevada
Engineer I
Building Official

Engr. Francis S. Pacaigue
CGADH-1/OIC
Building Official

 

Internal Process

1.3.4 Evaluation of Plans


1.3.4.1 Site Development/ Topographical Map, Model Houses and other facilities Architectural


1.3.4.2 Line and Grade


1.3.4.2 Road Structural Design/Site Grading Plan


1.3.4.3 Storm Drainage & Sewer System, Water System


1.3.4.4 Electrical Distribution System

 

 

None

 

 

 

 

None

 

None

 

 

None

 

 

None

19 days (in total)

Ar. Elizabeth D. Enriquez
Architect III

Building Official

 

 

 

Ar. Mark Anthony M. Barquilla
Architect II

Building Official

 

 

Engr. Zaldy R. Cademia
Engineer II

Building Official

 

 

Engr. Ara Tabitha A. Quevada
Engineer I

Building Official

 

 

Engr. Gilbert T. Oabel
Engineer IV

Building Official

 

Internal Process
1.3.5.1 If complied, the application will be assessed

1.3.5.2 If the application is not compliant,
all documents will be forwarded to front/admin
staff


1.3.6 Notify client of application status

None

 

 

None

 

 

 

 

None

 

1 hour

 

 

5 minutes

 

 

 

 

5 minutes

 

Engr. Francis S. Pacaigue
CGADH-1/OIC

Building Official

 

 

Allison R. Cuevas
Engineering Aide

Building Official

 

 

 

Allison R. Cuevas
Engineering Aide

Building Official

 

 

1.4 Claim Transmittal Sheet, pull out plans/documents (if necessary) and sign the Transmittal sheet acknowledging receipt (Refer with your design professionals for your necessary corrections as indicated on the copy of Transmittal given)

1.4 Assist Client in documents/permit forms/plans pulled-out for compliance

None

10 minutes (varies from
project to project)

Allison R. Cuevas
Engineering Aide

Building Official

1.5 Submit the corrected documents

1.5.1 Check if corrections have been done.


1.5.2 Forward to the concerned evaluator for
endorsement of compliance.


Internal Process
1.5.3 Re-evaluation of Plans

1.5.3.1 Site Development/Topographical Map, Model Houses and other facilities
Architectural


1.5.3.2 Line & Grade


1.5.3.2 Road Structural Design/Site Grading Plan


1.5.3.3 Storm Drainage & Sewer System, Water System


1.5.3.4 Electrical Distribution System


1.5.4 If the deficiencies are complied,
application is forwarded to assessment


1.5.5 Notification for the claiming of Order of
Payment.

 

 

None

 

 

None



 

 

 

None



None

 

 




None

None

 



None



 

None



 

None



 

 

None

 

 

 

 

10 minutes (varies from
project to project)

 

5 minutes (varies from
project to project)

 

 

 

3 days – in total (varies
from project to project)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5 minutes

 

 

 

 

5 minutes

 

 

 

Allison R. Cuevas
Engineering Aide

Building Official

 

 

Allison R. Cuevas
Engineering Aide

Building Official

 

 

 

Ar. Elizabeth D. Enriquez
Architect III

Building Official

 

 

 

Ar. Mark Anthony M. Barquilla
Architect II

Building Official

 

Engr. Zaldy R. Cademia
Engineer II

Building Official

 

 

 

Engr. Ara Tabitha A. Quevada
Engineer I

Building Official

 

 

Engr. Gilbert T. Oabel
Engineer IV

Building Official

 

 

Allison R. Cuevas
Engineering Aide

Building Official

 

 

 

 

Allison R. Cuevas
Engineering Aide

Building Official

 

2 Payment        

2.1 Pay the Cashier (Window 4)

 

 

 

 

 

 

 

 

 

 

2.1.1 Issue Official Receipt

 

 

 

 

 

 

 

2.1.2 Encode & Assign Development Permit Number

2.1.3 Print Certificate of Occupancy

2.1.4 Signing as approval of Development
Permit Forms and Plans

Refer to the schedule fees (National Building
Code of the Philippines PD 1096 and its RIRR

 

None

 

None

 

 

None

 

 

 

5 minutes

 

 

 

 

 

15 minutes

 

 

5 minutes

 

 

10 minutes

 

Treasurer’s 

 

 

 

 

 

Engr. Maria Leila P. Jarena
Admin.Officer V

Building Official

 


Admin.Officer II

Building Official

 

 

Engr. Francis S. Pacaigue
CGADH-1/OIC

Building Official

3 Releasing of Approved Final Permit
       

3.1 Claiming of Approved Development Permit
Plans


3.2 Sign Transmittal Logbook & Liability
Form as acknowledgement of receipt of document

3.1.Releasing of documents

 


3.2 Provide logbook, Transmittal Sheet, & Liability Form

None

 

 

 

 

None

10 minutes (in total)

Allison R. Cuevas
Engineering Aide

Building Official

 

 

Allison R. Cuevas
Engineering Aide
Building Official

3.3 Bring the Approved Development Permit Form to OCPDC-Zoning & CDRRMO

 

 

 

 

3.4 Bring copy of signed Development Permit

3.3 Received copy of signed Development Permit

None

2 minutes

Allison R. Cuevas
Engineering Aide

Building Official

 

TOTAL

Refer to the schedule fees (National Building
Code of the Philippines PD 1096 and its RIRR

For Highly Technical Transactions:
20 DAYS 2 HOURS 30 MINUTES

 

 

 

END OF TRANSACTION

 

 

Scroll to Top