Issuance of other Permits - Development Permit
FRONTLINE SERVICE: Issuance of other Permits – Development Permit
SCHEDULE OF AVAILABILITY OF SERVICE: Every day except weekends & holidays. 10am to 5pm
WHO MAY AVAIL OF THE SERVICE: Applicants of subdivision development projects (new and expansion)
DOCUMENTS NEEDED:
• Application Form for Development Permit (notarized)
• Four (4) original copies of Topographic Map of Site signed & sealed by Geodetic Engineer
• Four (4) original copies of Site Development Plan signed & sealed by licensed Civil Engr/ Architect
• Four (4) copies of Road (geometric structural) Design signed & sealed by civil Engr.
• Four (4) copies of Storm Drainage and Sewer system signed & sealed by Sanitary Engr/ Civil Engr
• Four (4) copies of Water System layout and details signed & sealed by Sanitary Engineer/ Civil engr
• Four (4) copies of Site Grading Plan signed by Civil Engr.
• Four (4) copies of Project Feasibility Study signed by Civil Engr.
• Four (4) copies of Electrical Distribution System signed by PEE
• Specifications, Bill of Materials, Cost Estimates signed & sealed by Civil Engineer
• Certification from MERALCO
• Certification from Prime Water (If not, a plan of overhead water tank together with NWRB clearance)
• Engineering Geological and Geohazard Assessment Report prepared by qualified geologist or engineer as required
under Administrative Order No. 2000-28 signed by the DENR Secretary Antonio H. Cerilles.
• Environment Compliance Certificate
• Certified True Copy of Lot title
• Tax Declaration and latest Tax Receipt (reproduced copy)
• Barangay Clearance
• PALC (Preliminary Approval & Locational Clearance)
FOR HOUSING CONSTRUCTION:
• Four (4) sets of plans (Architectural, Sanitary, Electrical, Structural, Specs and Cost estimates) signed & sealed by
Professionals
• Sworn Statement notarized (Soundness of designs, specs and cost estimates.
OTHER REQUIREMENTS:
• Secretary Certificate (if applicable)
• PTR/PRC of Professionals
• Valid IDs
PROCESSING OF DOCUMENTS: Every day except weekends & Holidays 8am to 5pm
FEES: Based on the National Building Code of the Philippines PD 1096
PROCESSING TIME: Complex – 14 working days
HOW TO AVAIL OF THE SERVICE:
STEP | PROCEDURES | ACTION OFFICER | PERSON IN CHARGE | DURATION OF ACTIVITY | FORM |
---|---|---|---|---|---|
1 | Submission of Documentary Requirement | Receiving, Initial Checking & Encoding | A.Cuevas | 20minutes | Customer Service Feedback Form: Form 1 – end of transaction feedback form available in the offices Form 2 – random survey/ walk-in complaint form available in PACO |
2 | Evaluation (Line & Grade, Architectural, Structural, Electrical, Sanitary/ Plumbing) | E. Enriquez/ G. Oabel/ A. Quevada/ F. Pacaigue | Complex – 5 hrs. NOTE : time is applicable for Total evaluation time : | Development Permit Forms & Plans | |
3 | Endorsement to OST | M. Rabina/ F. Pacaigue | Demolition Permit Forms & Plans
Endorsement Letter | ||
4 | b. Payment | If complied with OST & OBO: a.Assessment c.Recording d.Releasing | F. Pacaigue/ M. Jarena/ A.Cuevas | 10 minutes 10 minutes 20 minutes 10 minutes | Order of Payment Official Receipt Development Permit Certificate Customer Service Feedback Form: Form 1 – end of transaction feedback form available in the offices Form 2 – random survey/ walk-in complaint form |